
[heading animation="None" animation_iteration="1" type="2" bottom_margin="default" align="alignnone"]Our professionals have experience performing wetland delineations, wetland permitting, and mitigation design.[/heading]
[text animation="None" animation_iteration="1"]Our wetland scientists analyze vegetation, soil and hydrology criteria using U.S. Army Corps of Engineers manual guidelines to prepare technical reports.
We routinely prepare submittals to the Lake County Stormwater Management Commission (LCSMC) for preliminary jurisdictional determinations and to the U.S. Army Corps of Engineers (USACE) for jurisdictional determinations. Our staff prepares wetland permit applications to USACE for both the Regional Permits Program and as individual permit submittals for complex projects involving multiple agency coordination. We have developed management and monitoring plans and conducted native vegetation assessments and surveys.
We offer:
- Wetland Delineation
- Wetland Permitting and Mitigation Design
- Municipal Environmental Consulting and Wetland Review
- Studies and Consultation
- IDOT Environmental Survey Requests/FHWA Phase I Environmental Studies
- IDNR Threatened and Endangered Species Consultation (EcoCAT)
- USFWS Section 7 Listed Species Consultation